Profab North West Ltd Case Study Harbour Exchange Building, Canary Wharf

Harbour Exchange building Canary Wharf

When this building was being refurbished, Profab was on site to install and certify new lifting beams in the towers machine rooms during the upgrading of its 14 lifts.  

We manufactured and fitted in excess of 500 fabricated push switch brackets and provided some remedial building works on each landing, installed new fascia panels and pit refurbishment on each lift and installed a load bearing 2hr fire rated access hatch in both tower machine rooms.