Profab were ever present throughout the refurbishment of this iconic Liverpool building. Working on this project proved testing as the grade 1 listed building was one of the first buildings in the world to be built using reinforced concrete.
As part of our project we had to create a new machine room from an old store room, removing reinforced concrete and using flame cutting equipment to remove old steels and replace to a new design which could support the new machines, fit various lifting eyes and beams, fabricate and install guard rails and machine guards. The owners of the building were so pleased with our professionalism throughout the project, they placed us on their vendors list to do fabrication work directly for them